Worrall Bridge Renovation-April 23, 2010
WGN 45-13-10


I visited the Worrall bridge today and the Daniel's Construction crew is hard at it. The glulam chord beams have been delivered.
      The Lattice has been repaired and they have a full crew on site. They had replaced the upper lower chord on the downstream side.
      The engineer on site felt that it would be no problem getting it up and running by the end of July.
            Ray H


Worrall Bridge. Photo by Ray Hitchcock
April 23, 2010