kapellbruecke6
Return to First Page
page 6 of 6
|
Fig. 5 Remarkable is the kingpost likely from the construction period 1549-1552;
the braces were rather changed during 456 years, the planks date 2007 |
|
Fig. 6 A historic bridge needs traffic to be really estimated by the people,
but reduced load to 3.5 t and heigt 8 ft. 2" help us preserve it. |
Go To Page 1 of 6
Return to top
Joe Nelson, P.O Box 267, Jericho, VT 05465-0267
This file posted March 7, 2008
|