Renovation Continues on East Fairfield Covered Bridge (cont.)
VT-06-03

East Fairfield Covered Bridge. Photo by Joe Nelson September 4, 2008
This is where the west end of the upstream truss was bedded. Note that here, there was a small bedding timber. The treatment here is the same as for the downstream truss-end, the chord was cut off and the end-post mounted on the abutment cap.
East Fairfield Covered Bridge. Photo by Rae Laitres August 29, 2008
The downstream truss is laid atop the upstream truss for repairs. This truss seems to be in somewhat better condition than its twin.