efairfield08090507
Return to First Page
Renovation Continues on East Fairfield Covered Bridge (cont.)
VT-06-03
 |
Both queen posts on the upstream side have been modified with steel strapping to secure the posts to the chord. Normally, queen posts are joined to the chord with a lapped joint and end "knob". |
 |
This is a rafter beam with a series of mortises cut to recieve roof rafters with mating "birds-mouth" cuts. This one appears to have rotted, due probably to a roof leak. The rot apparently has been excavated by ants. This section of rafter is largly hollow. |
More Pictorial
Return to top
Joe Nelson, P.O Box 267, Jericho, VT 05465-0267
This file posted 09/07/2008
|