Renovation Continues on East Fairfield Covered Bridge (cont.)
VT-06-03

East Fairfield Covered Bridge. Photo by Joe Nelson September 4, 2008
The upstream truss and rafter beam system are down. They will be prepared to serve as landing pad for the downstream truss.
East Fairfield Covered Bridge. Photo by Rae Laitres August 29, 2008
See the upstream chord. The ouside chord member is not original fabric. Greg Wilcox, VAOT Resident Engineer, pointed out that this and other members of the chord had been replaced with
creosoted timber in repairs made in the past.