Renovation Continues on East Fairfield Covered Bridge (cont.)
VT-06-03
 |
The upstream truss and rafter beam system are down. They will be prepared to serve as landing pad for the downstream truss. |
 |
See the upstream chord. The ouside chord member is not original fabric. Greg Wilcox, VAOT Resident Engineer, pointed out that this and other members of the chord had been replaced with creosoted timber in repairs made in the past. |