Renovation Continues on East Fairfield Covered Bridge (cont.)
VT-06-03
 |
The The upstream truss has landed. Note that the lower chord remains bowed. |
 |
The truss and rafter posts and beams are laid on the pad. The rafter posts and beams drop away but the truss is intact. Note the lack of connection between the end posts and chord-ends. |