Worrall Bridge Renovation-May 31, 2010
WGN 45-13-10
A visit to Worral showed that they have reinstalled the wood cribbing so that they can remove the steel support beams.
Also the old bridge shows off its revitalized camber. With the scaffolding in place I can't replicate the original shot of the exposed downstream chord which showed its more variable nature.
Dan Hull advised me that they would start residing the bridge on Tuesday so thought I should get the attached shots.
Ray Hitchcock
|
Downstream Lower Chord Camber. |
|
Inside, down stream, lower chord camber. |
|
Upstream Chord from West Portal. |