Williamsville Bridge - January 4, 2010
WGN 45-13-05

I made a quick pass on the way to a meeting in Brattleboro yesterday afternoon. The fellow pictured was drilling holes in the lattice. By the time I got out of the traffic flow and got the camera out he was done with that hole.

He indicated that they would be finished with the second lattice and have it standing within two weeks.

The decking on the current bridge continues to disintegrate. It makes one a little nervous crossing it, in the hope that all the spikes and lag bolts are pointed down.

            - Ray Hitchcock

Williamsville Bridge. Photo by Ray Hitchcock
January 4, 2010
The fellow pictured was drilling holes in the lattice.
Williamsville Bridge. Photo by Ray Hitchcock
November 15, 2009
Loose planks piled on glulam support in original Williamsville Bridge