Renovation Continues on East Fairfield Covered Bridge (cont.)
VT-06-03
|
The tie beams and "X" braces are fully exposed after the removal of the flooring and joists. Photo by Joe Nelson Sept 2, 2008. |
|
The floor system is removed. Only the trusses remain, temporarily braced with cables and planks. Note the "nailors" reenforcing the connections of the rafter beams and braces. Photo by Joe Nelson on September 4, 2008. |